Best answer: How long does it take to make curtains?

How long do custom curtains take?

Our custom drapes can take up to 6 and 8 weeks to manufacture, then shipping. In most cases they can ship as fast as 3 to 4 weeks.

How hard is it to make curtains?

Making curtains is easy, but only if you know the basics

Curtains are almost all straight sewing, making them an easy project for beginners. That said, there are still some basics to master before embarking on sewing curtains for the first time.

How much fabric do I need to make curtains?

A simple rule of thumb is that a curtain is one and a half to two times the width of the area it is meant to cover. A heavier fabric will provide fullness that a lightweight fabric can not. The lighter the weight of the fabric, the more fullness it will require.

How long does it take to install blind?

Once everything is in, fitting blinds the blinds is fairly quick. Times may vary from job to job depending on moving furniture etc. Blind 1 will generally take 20 – 30 minutes including bringing everything in. Every blind after that will take 10 -15 minutes.

How long does it take to install roller shades?

Roller shades are straightforward to install, taking less than 30 minutes once you know the steps. You don’t need any fancy tools to get started, either.

THIS IS FUNNING:  What can I wear with a GREY knit dress?

How do you calculate curtains?

There’s a simple calculation to work out how much curtain fabric you need. First, multiply the track/pole width by your chosen fullness (eg. Pole width 150cm x 2.5 = 375). Next, divide that figure by the fabric width, which is typically 137cm (375 divided by 137 = 2.73).